Details of significant projects undertaken:
Consultancy for maintenance supervision of roads and bridges
Duration:
2 years
Completion date:
Project running
Approximate value:
USD 3,600,000
Client:
National Road Administration - ANE
Team size:
33
Location:
Sofala
Description:
The project covers the maintenance of the 2,342 km road network in the Sofala province. This includes 435 km of paved roads.
As consultants to ANE, Stange Consult is responsible for the maintenance of all national roads and bridges in the province.
Additional support is given to the local administrations and district municipalities to implement maintenance activities for the Road Fund.
Consultancy for maintenance supervision of roads and bridges
Duration:
3 years
Completion date:
Project running
Approximate value:
USD 3,500,000
Team size:
27
Client:
National Road Administration - ANE
Location:
Gaza
Description:
The project covers the maintenance of the 3,318 km road network in the Sofala province. This includes 606 km of paved roads.
As consultants to ANE, Stange Consult is responsible for the maintenance of all national roads and bridges in the province.
Additional support is given to the local administrations and district municipalities to implement maintenance activities for the Road Fund.
Gaza emergency repairs
Duration:
10 months
Completion date:
January 2015
Approximate value:
USD 1,000,000
Team size:
6
Client:
National Road Administration - ANE
Location:
Gaza
Description:
Stange Consult was engaged to carry out repairs and improvements to the road infrastructure after flood damages.
Areas worked on include Xai-Xai, Chilaulene and Mohambe.
Funded by the World Bank.
Installation of Area Based Maintenance System (ABMS)
Duration:
2.5 years
Completion date:
October 2013
Team size:
3
Client:
National Road Administration - ANE
Location:
Inhambane
Description:
The installation of Area Based Maintenance System (ABMS) in the province of Inhambane.
ABMS is a labour-based road maintenance management system based on the use of appropriate technologies (developed by Stange).
Community support program
Duration:
6 months
Completion date:
May 2013
Client:
National Road Administration - ANE
Team size:
10
Location:
Inhambane, Manica
Description:
Many rural communities in Mozambique have poor access to water partly due to low rainfall. Research and preliminary experiments show that catchments along roads may be used to improve the supply of water to local communities in Mozambique. The project identified potential sites along the roads that could be used for the collection and storage of water. Relevant structures were then designed and built to collect and store water for local communities.
Funded by AFCAP.
Consultancy for maintenance supervision of roads and bridges
Duration:
5 years
Completion date:
February 2013
Approximate value:
USD 8,000,000
Team size:
24
Client:
National Road Administration - ANE
Location:
Inhambane
Description:
The project covered the maintenance of the 2,848 km road network in the Inhambane province. This includes 670 km of paved roads.
As consultants to ANE, Stange Consult was responsible for the maintenance of all national roads and bridges in the province.
Additional support was given to the local administrations and district municipalities to implement maintenance activities for the Road Fund.
Consultancy for maintenance supervision of roads and bridges
Duration:
5 years
Completion date:
February 2013
Approximate value:
USD 8,000,000
Team size:
24
Client:
National Road Administration - ANE
Location:
Niassa
Description:
The project covered the maintenance of the 3,082 km road network in the Niassa province. This includes 525 km of paved roads.
As consultants to ANE, Stange Consult was responsible for the maintenance of all national roads and bridges in the province.
Additional support was given to the local administrations and district municipalities to implement maintenance activities for the Road Fund.
Supervision over the design and construction of the bridge over Luchimua river
Duration:
3 years
Completion date:
November 2012
Approximate value:
USD 2,000,000
Team size:
6
Client:
National Road Administration - ANE
Location:
Niassa
Description:
The bridge was constructed using reinforced concrete with 4 spans of 20m each and 1.5m support pillars. Construction of the bridge began in 2009 and was financed by the Republic of Ireland.
This project provided a shorter link between the districts of Majune and Mandimba.
Training, technical assistance and the establishment of Mozambique based maintenance camps (ABMS System)
Duration:
7 months
Completion date:
May 2011
Approximate value:
USD 150,000
Team size:
3
Client:
National Road Administration - ANE
Location:
Manica, Sofala, Zambezia, Tete
Description:
The ABMS maintenance system was developed, with the support from KFW, in five provinces of Mozambique. These being Manica, Tete, Zambezia, Sofala and Inhambane. The National Road Administration (ANE) intends to introduce the ABMS in all provinces of Mozambique.
Stange Consult was contracted by ANE to provide advice and training for staff and consultants within the provinces. This training covered operational concepts and procedures of the camp system (ABMS).
Design and construction of the bridge over Muadzane river
Duration:
10 months
Completion date:
January 2010
Approximate value:
USD 65,000
Team size:
3
Client:
National Road Administration - ANE
Location:
Inhambane
Description:
During the heavy rains that fell in the months of December 2008 and January 2009, the national road (N1) at the Massinga Lindela section was cut off due to deficiencies in the drainage system along this section of road.
Stange Consult redesigned the bridge with three 8m spans and prepared tender documents for the construction of the bridge.
Study of road networks to set priorities for repair and maintenance
Duration:
7 months
Completion date:
September 2009
Approximate value:
USD 300,000
Location:
Inhambane
Team size:
5
Description:
A comprehensive study of all secondary roads in the province, evaluation and selection of necessary construction and maintenance, cost analysis and implementation of the plan.
Socio-economic survey for setting a strategy for poverty alleviation.
Identifying and analyzing the environmental impacts and determining mitigation strategies.
Client:
National Road Administration - ANE
Consultancy for maintenance supervision of roads and bridges
Duration:
4.75 years
Completion date:
July 2007
Approximate value:
USD 3,500,000
Team size:
24
Client:
National Road Administration - ANE
Location:
Manica
Description:
The project covered the maintenance of the 1,970 km road network in the Manica province. This includes 422 km of paved roads.
As consultants to ANE, Stange Consult was responsible for the maintenance of all national roads and bridges in the province.
Additional support was given to the local administrations and district municipalities to implement maintenance activities for the Road Fund.
Consultancy for maintenance supervision of roads and bridges
Duration:
4.75 years
Completion date:
July 2007
Approximate value:
USD 3,500,000
Team size:
24
Client:
National Road Administration - ANE
Location:
Tete
Description:
The project covered the maintenance of the 2,762 km road network in the Tete province. This includes 275 km of paved roads.
As consultants to ANE, Stange Consult was responsible for the maintenance of all national roads and bridges in the province.
Additional support was given to the local administrations and district municipalities to implement maintenance activities for the Road Fund.
Bridge design for the bridge over Muira river
Duration:
3.5 years
Completion date:
June 2006
Approximate value:
USD 60,000
Team size:
3
Client:
Public Works and Housing - DANIDA
Location:
Manica
Description:
The Muira river crosses the road during the rainy season which prevents it from being used. Stange Consult was hired to prepare detailed designs and plans for the construction of a bridge to cross this river. The final design was a 150m bridge with a reinforced concrete substructure.
Development of management planning models for road maintenance
Duration:
15 months
Completion date:
May 2006
Approximate value:
USD 180,000
Team size:
2
Client:
National Road Administration - ANE
Location:
All provinces
Description:
Analysis of the existing models for planning and proposed improvements to these models. The preparation of a manual on maintenance planning and proposals for manual planning in regional workshops. Maintenance training at a provincial level for planning staff.
Funded by the British Government.
Supervision of the construction of roads
Duration:
8 months
Completion date:
February 2004
Approximate value:
USD 80,000
Team size:
8
Client:
National Road Administration - ANE
Location:
Manica, Tete
Description:
Stange Consult was hired to provide additional supervision to the existing projects in the provinces of Manica and Tete. This was to improve quality control of the construction and maintenance programs.
Funded by DANIDA.
Design review and inspection of an 84km tertiary road
Duration:
2.5 years
Completion date:
June 2003
Approximate value:
USD 400,000
Team size:
7
Client:
National Road Administration - ANE
Location:
Tete
Description:
The project was an 84 km road, which feeds a rich agricultural area. The road was deserted at commencement of the project. Stange Consult conducted a complete survey, including materials research, realignment, road geometry and construction improvements.
The construction was mainly done using labour-based technology.
Periodic maintenance of the EN 103 road
Duration:
18 months
Completion date:
April 2002
Approximate value:
USD 180,000
Team size:
5
Client:
National Road Administration - ANE
Location:
Tete
Description:
Repainted the damaged sections and supervised all construction on the EN 103 road and highway linking Malawi, Mozambique and Zimbabwe. The project included periodic maintenance of the entire road with the weak segments being repaired systematically. A 266 km stretch of road was resealed.
The IDA financed the project to the value of USD 6 million.